THESS Engineering
EPC of BESS 30MW/60MWh Ternitsa

EPC of BESS 30MW/60MWh Ternitsa

30MW / 60MWh Battery Energy Storage System (BESS) in Ternitsa, Fokida

Details

Sector
Energy Storage
Location
Ternitsa, Regional Unit of Fokida, Region of Central Greece
Client
Paralos Energy
Year
2025
Duration
2 months
Cost
€€
ProjectCategory
Industrial Project
Field
Energy Storage Systems
Services Provided
Detailed Design of Active & Passive Fire Protection Systems for Containerized BESS
Service
ind
Key Engineering Highlights:
• Fire protection design for 30MW / 60MWh BESS
• Active & passive fire protection studies
• Automatic suppression for containerized battery systems
• Detailed drawings & calculation documentation
• Integration within large-scale EPC energy storage project

Description

Comprehensive active and passive fire protection studies were prepared at detailed design level, covering automatic fire suppression systems for containerized battery units.

Deliverables included layout drawings, diagrams and detailed construction drawings, as well as calculation reports, technical specifications and technical descriptions.

The design focused on compliance with applicable fire safety standards, thermal runaway risk mitigation and seamless integration within the overall EPC framework of the project.


Executive Summary
The project concerned the EPC development of a 30MW / 60MWh Battery Energy Storage System (BESS) in Ternitsa, Fokida. Our scope included the preparation of detailed fire protection studies for containerized battery storage systems.

N. MACHERAS & SIA L.P.

Alexandrias 111, 54646 Thessaloniki, Greece
+30 2310 413448
info@thessengineering.gr

30MW / 60MWh Battery Energy Storage System (BESS) in Ternitsa, Fokida
30MW/60MWh, Battery, Energy, Storage, System, (BESS), Ternitsa, Fokida
Electrical & MEP Engineering Projects
KotasDesign © 2026
with geodi engine
scroll up
gallery ❰   ❱