22MW / 44MWh Battery Energy Storage System (BESS) in Vevi, Florina
Details
SectorEnergy Storage
LocationVevi, Florina, Region of Western Macedonia, Greece
ClientParalos Energy
Year2025
Duration2 months
Cost€€
ProjectCategoryIndustrial Project
FieldEnergy Storage Systems
Services ProvidedDetailed Design of Active & Passive Fire Protection Systems for Containerized BESS
Serviceind
Key Engineering Highlights:• Fire protection design for 22MW / 44MWh BESS
• Active & passive fire protection studies
• Automatic suppression for containerized battery systems
• Detailed drawings & calculation documentation
• Integration within large-scale EPC energy project
Description
Comprehensive active and passive fire protection studies were prepared at detailed design level, covering automatic fire suppression systems for containerized battery units.
Deliverables included layout drawings, diagrams and detailed construction drawings, as well as calculation reports, technical specifications and technical descriptions.
The design focused on compliance with applicable fire safety standards, mitigation of thermal runaway risks and seamless integration within the overall EPC framework.
Executive Summary
The project concerned the EPC development of a 22MW / 44MWh Battery Energy Storage System (BESS) in Vevi, Florina. Our scope included the preparation of detailed fire protection studies for containerized battery storage systems.