Construction of a New Bakery Industrial Facility, included the preparation of the final design for the power electrical installations
Details
SectorFood Industry
LocationMunicipality of Oreokastro, Region of Central Macedonia, Greece
ClientZEO BAKERY
Year2024
Duration2 months
Cost€€
ProjectCategoryIndustrial Project
FieldFood Industry
Services ProvidedFinal Design of Power Electrical Installations for Building Permit
Serviceind
Key Engineering Highlights:• Final design of power electrical installations
• Layout drawings and single-line diagrams
• Load calculations and panel sizing
• Technical specifications & descriptive documentation
• Compliance with industrial food production requirements
Description
The study covered the complete design of strong current (power) electrical installations, including layout drawings of the facility and single-line diagrams of electrical distribution panels.
Calculation reports, technical specifications and detailed technical descriptions were prepared to document and support the design of the electrical installations.
Particular emphasis was placed on load estimation, proper distribution architecture and compliance with applicable electrical installation standards for food production facilities.
Executive Summary
The project concerned the construction of a new bakery industrial facility. Our scope included the preparation of the final design for the power electrical installations required for the issuance of the building permit.