Two New 14.450 MWe Diesel Gas Turbine Units – Lesvos Island

Two New 14.450 MWe Diesel Gas Turbine Units – Lesvos Island

14.450 MWe diesel gas turbine units intended for installation within a PPC (Public Power Corporation) substation on Lesvos Island, to cover peak power demand

Details

Sector
Energy Storage
Location
Lesvos Island, Greece
Client
Arignoti S.A. – DEI S.A.
Year
2025
Duration
2 months
Cost
€€€
ProjectCategory
Industrial Project
Services Provided
Detailed Design of Transformer Fire Protection System
Service
ind

Description

A complete application-level study was carried out for the transformer fire protection system, including hydraulic calculations and network sizing.

The scope included detailed design of the fire protection piping network for both transformers and its integration with an existing connection point within the substation facility.

Deliverables comprised 3D application drawings, layouts, sections, construction details, material take-off lists, and isometric drawings of piping and supporting structures.


Executive Summary
The project concerned the installation of two new 14.450 MWe diesel gas turbine units intended for installation within a PPC (Public Power Corporation) substation on Lesvos Island, to cover peak power demand. Our scope focused on the full detailed design of the fire protection system serving the two power transformers.

14.450 MWe Diesel Gas TurbineDetailed Design of Transformer Fire Protection System
N. MACHERAS & SIA L.P.

Alexandrias 111, 54646 Thessaloniki, Greece
+30 2310 413448
info@thessengineering.gr

14.450 MWe diesel gas turbine units intended for installation within a PPC (Public Power Corporation) substation on Lesvos Island, to cover peak power demand
14450MWe, Diesel, Gas, Turbine, Lesvos
Electrical & MEP Engineering Projects
KotasDesign © 2026
with geodi engine
scroll up
gallery ❰   ❱