Subproject: Automatic Fire Suppression System for 150kV Power Transformers. Main Project: Construction of 220/110 kV Substation in Lajanuri (Phase I); Construction of 220/110 kV Substation in Ozurgeti (Guria)
Details
LocationLajanuri & Ozurgeti, Georgia
ClientArignoti S.A. - METLEN ENERGY & METALS - FICHTNER GmbH & Co.KG - GEORGIAN STATE ELECTROSYSTEM JSC
Year2024
Duration2 months
Cost€
ProjectCategoryIndustrial Project
Services ProvidedDetailed Fire Protection Engineering & 3D Application Design
Serviceind
Key Engineering Highlights:• Automatic fire suppression system for 150kV transformers
• Fire pump station & water tank detailed design
• High-voltage substation fire network engineering
• Full 3D coordinated construction documentation
• Compliance with project-specific technical specifications
Description
A complete application-level study was carried out for the automatic transformer fire protection system, including hydraulic calculations and system configuration.
The engineering scope covered the detailed design of the fire pump station, fire water storage tank and the external fire protection piping network serving the transformers.
Comprehensive 3D application drawings were produced, including plans, sections, construction details, material take-off lists and piping isometric drawings, ensuring constructability and full coordination within the high-voltage substation environment.
Executive Summary
This subproject concerned the detailed engineering design of an automatic fire suppression system for 150kV power transformers within high-voltage substations in Georgia. The design was developed in strict compliance with the main contractor’s technical specifications and international high-voltage substation safety requirements.
Associated Main Project
Construction of 220/110 kV Substation in Lajanuri (Phase I); Construction of 220/110 kV Substation in Ozurgeti (Guria); Extension of 500 kV and 400 kV AC Switchyards in Akhaltsikhe Converter Station