Step-Up substation (150/20 kV) Vavdos II (Renewable Energy Project)

Step-Up substation (150/20 kV) Vavdos II (Renewable Energy Project)

Final electromechanical design studies were prepared for the control building of the 150/20 kV step-up substation (Vavdos II), developed within a renewable energy project.

Details

Sector
Renewable Energy
Location
Vavdos, Municipality of Polygyros, Chalkidiki, Greece
Client
EGNATIA WIND MONOPROSOPI S.A. – ELECTROMEC S.A.
Year
2022
Duration
6 months
Cost
€€
ProjectCategory
Industrial Project
Field
HV/MV Substations
Service
ind

Description

The study included fire protection systems, water supply and drainage installations, heating and cooling systems, lightning protection, foundation earthing, as well as strong and weak current electrical installations.

Complete documentation was produced including energy study reports, technical descriptions and technical specifications.


Executive Summary
Final electromechanical design studies were prepared for the control building of the 150/20 kV step-up substation (Vavdos II), developed within a renewable energy project.

N. MACHERAS & SIA L.P.

Alexandrias 111, 54646 Thessaloniki, Greece
+30 2310 413448
info@thessengineering.gr

Final electromechanical design studies were prepared for the control building of the 150/20 kV step-up substation (Vavdos II), developed within a renewable energy project.
STEP-UP, SUBSTATION, 150/20, kV, VAVDOS, RENEWABLE, ENERGY, electromechanical
Electrical & MEP Engineering Projects
KotasDesign © 2026
with geodi engine
scroll up
gallery ❰   ❱