Final electromechanical design studies were prepared for the control building of the 150/20 kV step-up substation (Vavdos II), developed within a renewable energy project.
Details
SectorRenewable Energy
LocationVavdos, Municipality of Polygyros, Chalkidiki, Greece
ClientEGNATIA WIND MONOPROSOPI S.A. – ELECTROMEC S.A.
Year2022
Duration6 months
Cost€€
ProjectCategoryIndustrial Project
FieldHV/MV Substations
Serviceind
Description
The study included fire protection systems, water supply and drainage installations, heating and cooling systems, lightning protection, foundation earthing, as well as strong and weak current electrical installations.
Complete documentation was produced including energy study reports, technical descriptions and technical specifications.
Executive Summary
Final electromechanical design studies were prepared for the control building of the 150/20 kV step-up substation (Vavdos II), developed within a renewable energy project.